top of page
GUJARAT SIDHEE CEMENT
  • Complete Coal mill erection and commissioning (structure fabrication and erection, coal mill separator, coal mill classifier, and other Equipment)

  • 2 nos I.D fan erection and commissioning.

  • IKN pendulum cooler assembly erection and commissioning.

  • kiln Shell replacement 2.5mtr length.

  • kiln girth gear replacement.

  • 3 nos kiln tire chair plat replace and swing in.

  • cement mill center Shell replacement 1.5mtr length.kiln tire replacement

bottom of page